MSI Sales Management Procedure Templates

ISO Sales Management Procedure Template & Guide

$149

A complete, editable ISO 9001 Clause 8.2 sales and contract review procedure — written as a working document, not an outline. Includes the requirements review record, the contract review work instruction, and the contingency path almost no procedure has. OR choose the ISO 13485 version. 

For either ISO 9001 or ISO 13485

What is actually in the ISO 9001 document

Twenty-five pages covering the whole of ISO 9001 Clause 8.2 — customer communication, determining requirements, review before commitment, and changes after it. Written as a filled-in worked example, so you can see a finished version before you change a word of it.

25pages, editable Word
17records, none left blank
19obligations cross-referenced
14MSI notes in the margin
115marked decisions that are yours

That last figure is the honest one. A hundred and fifteen bracketed values remain, and each is a decision only your organisation can make — your thresholds, your roles, your systems, your retention periods. What the template removes is the other work: knowing which decisions those are, where each belongs, and what a defensible answer looks like. They are marked rather than hidden, because anything left unreplaced is an ambiguity your team resolves under pressure.

What's included

  • The complete Clause 8.2 procedure — sixteen numbered sections, editable Microsoft Word
  • A channel-enumerated trigger — every route an inquiry can arrive by, including the verbal order taken at a trade show
  • One accountable owner, with a named alternate for every gating role
  • Light and full review routing, both fully compliant, decided on criteria rather than on order value
  • The "requirements not stated but necessary" question set — the abstract clause turned into questions a reviewer can answer
  • Three named routes for resolving differences, each with an owner and a record
  • Contingency in both directions — what your contracts require of you, and what happens when you cannot deliver
  • A records table with no blanks — seventeen records, each with a location, an owning role and a retention period
  • Event-based review triggers, with the calendar demoted to a backstop
  • A maturity ladder — eight elements, four levels each, described as observable behaviour
  • A full clause cross-reference mapping nineteen obligations to where each is addressed
  • A process interaction map showing what feeds the procedure, what it hands on, what governs it and what supports it
  • Appendix A — Requirements Review Record, built to function as the release gate
  • Appendix B — Customer Communication and Complaint Log
  • Appendix C — Contract Review Work Instruction, with a worked example

Every appendix, form and worked example is part of the document. Nothing is sold separately.

Three things in this that are in almost nothing else

01

The contingency requirement

Clause 8.2.1(e) was new in the 2015 revision, with no predecessor in 2008. Organisations transitioning mapped old clause references to new ones — and this one had nothing to map from, so it fell through and never came back. The phrase "when relevant" finished the job. Most sales procedures still do not mention it.

02

What happens when you cannot deliver

Not a requirement of any clause, which is exactly why nobody writes it. Capacity lost, supplier failed, a test failed the week before shipment — and no procedure says who tells the customer, or when. Customers forgive the failure far more readily than they forgive the silence.

03

A records table with no blanks

Every record carries a named location and a named owning role. Inherited procedures are full of TBD, and an undetermined location reads, to anyone examining it, as a decision that was never made.

Who it's for

Quality managers, operations leaders and consultants at ISO 9001 certified or certifying organisations. Particularly useful where sales sits outside the quality function, where an inherited procedure has drifted from practice, or where a transition left gaps nobody has gone back for.

Not sure yet? The free Sales Management Maturity Check scores your current process in under five minutes. Your score and band appear immediately, without entering anything.

Questions

Is this a template or a finished procedure?

Both, deliberately. It is written as a filled-in worked example so you can see what each element looks like when done properly, with bracketed placeholders wherever a value is genuinely yours to set. You are editing a working document rather than filling in a hollow outline.

What format is it?

Editable Microsoft Word (.docx). Adapt it, rebrand it, and adopt it into your own document control system. The licence permits the buying organisation to use it across its own sites and issue it to employees, contractors and auditors, and permits consultants to adapt it for engagements they deliver.

Will this pass an audit?

A procedure does not pass an audit; an organisation does. What this gives you is a procedure that addresses every requirement of the clause with a named owner and a named record, and that describes a process people can actually follow. Conformity is demonstrated by implementation and evidence — a perfect document over an operation that ignores it is still a finding. Unfilled placeholders are unmet requirements, so fill them.

Does it cover the whole standard?

No. This covers ISO 9001 Clause 8.2 in full. It is one procedure in a management system, and it references the neighbouring processes — document control, complaint handling, risk management, design control — rather than replacing them.

We use different clause numbering and a different document system.

Every cross-reference sits in a table at the back rather than baked into the body text, precisely so you can renumber without unpicking the procedure.

What happens when ISO 9001 is revised?

Purchasers receive the updated template at no charge when it publishes. The cover states which template version you hold and which edition of the standard it was built to, so you always know where you stand.

What is actually in the ISO 13485 document

Twenty-five pages covering the whole of ISO 13485:2016 Clause 7.2 — determination of requirements, review prior to commitment, and communication arrangements. Written for device organisations as a filled-in worked example, not adapted from a quality base.

25pages, editable Word
21obligations cross-referenced
10MSI notes in the margin
139marked decisions that are yours

Since 2 February 2026, this is a regulatory document. The FDA Quality Management System Regulation incorporates ISO 13485:2016 by reference into 21 CFR Part 820. For US-marketed devices, your customer-related processes procedure is the operative form of a federal requirement, and the records it generates are inspectable.

Three things device sales procedures routinely omit

01

User training determination

Clause 7.2.1(d) requires you to determine any training needed to ensure specified performance and safe use, and 7.2.2(d) requires confirming at review that it is available or planned. There is no ISO 9001 equivalent, so it is absent from most procedures adapted from a quality base. It matters beyond compliance: where a risk control is implemented through the user rather than through the design, the training is the risk control. Supply without it and the control is not in place.

02

Supply interruption reporting

ISO 13485 has no equivalent to ISO 9001's contingency clause. For device manufacturers the obligation arises from law instead — which is precisely why it is missing from so many quality systems. No clause checklist points at it. This procedure covers both regimes: FD&C Act Section 506J in the United States, and EU MDR and IVDR Article 10a.

03

Advisory notices, arranged in advance

The arrangement for issuing an advisory notice is a communication requirement of the clause, not something to work out during the event. Appendix B logs it alongside customer communication and complaints, so the route exists before you need it.

What's included

  • The complete Clause 7.2 procedure — sixteen numbered sections, editable Microsoft Word
  • A channel-enumerated trigger covering every route an inquiry can arrive by
  • One accountable owner, with a named alternate for every gating role
  • Review routing decided on criteria rather than on order value
  • User training determination at both determination and review
  • Regulatory authority communication and advisory notice arrangements
  • Supply interruption reporting under both the US and EU regimes
  • A records table with no blanks — location, owning role and retention period for each
  • A maturity ladder — eight elements, four levels each, described as observable behaviour
  • A full clause cross-reference mapping twenty-one obligations to where each is addressed
  • A process interaction map including the regulatory reporting and vigilance interface
  • Appendix A — Requirements Review Record, built to function as the release gate
  • Appendix B — Communication, Complaint and Advisory Notice Log
  • Appendix C — Contract Review Work Instruction, with a worked example

Every appendix, form and worked example is part of the document. Nothing is sold separately.

Who it's for

Quality and regulatory managers at device manufacturers, contract manufacturers and specification developers certified or certifying to ISO 13485. Particularly useful for organisations whose customer-related processes procedure was adapted from an ISO 9001 base, which is where the training and reporting obligations usually go missing.

Not sure yet? The free Sales Management Maturity Check has a device path that adds the requirements with no ISO 9001 equivalent. Under five minutes, and your score appears without entering anything.

Questions

Is this a template or a finished procedure?

Both, deliberately. It is written as a filled-in worked example so you can see what each element looks like when done properly, with bracketed placeholders wherever a value is genuinely yours to set. You are editing a working document rather than filling in a hollow outline.

Does it address the QMSR?

Yes. Since 2 February 2026 the FDA Quality Management System Regulation incorporates ISO 13485:2016 by reference into 21 CFR Part 820. The procedure is written on that basis, and the cross-reference maps obligations across both the standard and the regulation.

Why not just adapt an ISO 9001 procedure?

Because the clause numbers do not map and the obligations differ. ISO 13485 predates the harmonised ten-clause structure, and it carries requirements with no ISO 9001 counterpart — user training determination and advisory notices among them. Adapting a quality procedure is how those requirements go missing in the first place.

What format is it?

Editable Microsoft Word (.docx). Adapt it, rebrand it, and adopt it into your own document control system. The licence permits the buying organisation to use it across its own sites and issue it to employees, contractors and auditors, and permits consultants to adapt it for engagements they deliver.

Will this pass an inspection?

A procedure does not pass an inspection; an organisation does. What this gives you is a procedure that addresses every requirement of the clause with a named owner and a named record. Conformity is demonstrated by implementation and evidence. Unfilled placeholders are unmet requirements, so fill them.

We run both a device line and a general line.

Take the integrated ISO 9001 and ISO 13485 version instead. It covers both standards in one document with device-scope content marked throughout, and includes a decision record naming every point where the two standards diverge.